April 20 deadline for comments on NG cost overruns

Posted: April 13, 2017 in Uncategorized
Tags: , , , , , ,

Comment by 4/20 by Patricia Burke  re: Smart Meter Pilot Cost Overruns

April 20 is the deadline for comments to the Department of Public Utilities regarding surcharging ratepayers $15M for cost overruns for the $45M Worcester smart meter pilot.

National Grid’s pilot did not include health monitoring, but featured safety testimony from a tobacco scientist.  In Arizona’s current utility rate case, Dr. Sam Milham M.D. M.P.H. stated,  “It is my professional opinion that smart meters are a public health hazard.”

 

Expert testimony indicates that electrical noise due to the switch mode power and radio frequency transmissions being conducted along house wiring and re-radiated into the home are causing biological harm.  Sleep deprivation (recognized by the UN as torture) is a primary health complaint associated with smart meters.

 

As reported by Lynne Weycherly in the Ecologist, “they emit as many as 14,000 short bursts of intense microwave radiation a day, disrupting cellular electrochemistry and causing health symptoms from migraine to tinnitus, insomnia, dizziness, anxiety, chest pain, palpitations and memory loss.”

 

Michigan’s Senator Colbeck testified that smart meters are at risk from EMPs (electromagnetic pulses), fires, and hacking due to: no surge protection, no conducted emissions filters, no circuit breaker between the meter and power source, and the cyber security “back door.” He endorses analogues.

 

Ratepayers should not be on the hook for excessive costs. Instead, the pilot should be investigated for violating prohibitions on human experimentation without informed consent, misrepresentation, and as a case study in misguided decision-based evidence-making that manipulated community consent. Be heard. Please comment.

http://170.63.40.34/DPU/FileRoomAPI/api/Attachments/Get/?path=17-53%2fOrder_of_Notice.pdf

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s